The Grand Banquet Hall at Yalong Hotel features magnificent, soaring ceilings. While visually stunning, these extra-high windows presented a major operational challenge: Maintenance. Traditional methods would require expensive scaffolding or scissor lifts just to remove the heavy velvet curtains for cleaning, creating safety risks and operational downtime.
Our Solution: Motorized Liftable (Hoistable) System We engineered a specialized Motorized Lifting Curtain System that solves the "height problem" by allowing the entire track to be lowered to floor level:
Easy Maintenance (Lift & Lower): The core innovation is the hoistable mechanism. With a simple key-switch operation, the entire curtain track can be lowered from the ceiling to a comfortable working height (1.2m from the floor). This allows staff to easily detach, clean, and re-hang the massive curtains without climbing a ladder.
Heavy-Duty Load Capacity: Engineered for high-ceiling banquet halls, the system supports a heavy load capacity tailored for large-scale drapery. It easily manages the weight of the thick, sound-absorbing velvet fabrics required for the venue, ensuring stability both while stationary and during lifting.
Dual-Motor Functionality: The system integrates two distinct motor functions: one for the daily Opening/Closing of the curtains (horizontal movement) and a specialized tubular motor system for the Vertical Lifting of the track structure itself.
Safety First: Equipped with a mechanical anti-fall device and limit switch protection, the system ensures 100% safety during the lifting process. It automatically locks in place at the top position to prevent any accidental slippage.
![]()
![]()